Operational Data Centre, Homebush NSW
Installation of air cooled chillers and chilled water pipework while the data centre maintained operation on the existing condenser water circuit. A progressive changeover to 24 new chilled water CRAC units while existing units and pipework were removed. This system comprised of 50mm to 200mm Type B Copper tube and 250mm to 300mm Grade 316 Stainless Steel tube.
Details | |
---|---|
Client | Crest Air Conditioning Pty Ltd |
Scope | Installation of air cooled chillers and chilled water pipework while the data centre maintained operation on the existing condenser water circuit. A progressive changeover to 24 new chilled water CRAC units while existing units and pipework were removed. This system comprised of 50mm to 200mm Type B Copper tube and 250mm to 300mm Grade 316 Stainless Steel tube |