FIONA STANLEY HOSPITAL, PERTH
Healthcare
Client
Triple M Mechanical WA Pty Ltd
Brief
1,800 metres of Chilled and low Temperature Hot Water Pipework, 900NB Grade 316L Condenser Water Pipework.
With full QA and weld mapping, this high spec carbon and stainless steel installation involved pipe up to 900 diameter for Steam, Low Temperature Hot Water, Condenser, Chilled & Generator water.
Highlight
Located in Murdoch WA, Fiona Stanley Hospital is the largest building infrastructure project ever to be undertaken by the State of Western Australia. Works for this fitout included AHUs and FCUs, CHW, HHW, Steam and Condensate and Humidifiers to AHUs. A stand alone CEP with tunnel system serving the Fiona Stanley Hospital site. Victaulic System was used in the tunnels while the Main plant was fully welded.